
The ground road of the south section of Ji'nan connecting line of Jinan Guangzhou Expressway (the South extension of the Second Ring Road West) the second section of national highway G104 of the second phase project starts 100 meters to the west of the junction of Shanshui Cement Plant in the West ends at about 200 meters to the East of the Second Ring Road West in the East, with a length of 1.2 km. The width of the new road red line is 60m, the width of the carriageway is 32m, the green belt of 3.0m on both sides separates the motor vehicle lane the non motor vehicle lane, the width of the non motor vehicle lane the sidewalk is 6.0m. Hongliang cable is adopted for the implementation of the project to reach cooperation.
158-5311-6666 Head office address:Dacao Technical Economic Development Area, Xingtai city ,Hebei province, China Operation Department: Jinan high tech Zone, Shandong Province |
official account Wechat inquiry |